🐾 Elevate Your Training Game!
The Lynxking Check Cord Dog Leash is a heavy-duty, long lead designed for training and tracking. With a comfortable handle, tangle-free design, and water-resistant properties, it’s perfect for outdoor activities with dogs of all sizes. Available in multiple lengths, this leash combines strength and portability for the ultimate training experience.
F**K
Unleash Your Dog's Potential with This Long Line Training Leash!
This leash is amazing for training my dog. It is sturdy, easy to use and long enough to let my dog really explore their environment and remain safe. It's easy to control the length of the leash, and it doesn't get tangled or snagged.It has a handle that is comfortable to hold and doesn't hurt my hand.I've purchased two of these leashes, one to use at home and one for the travel trailer to use when camping with my fur baby. They are both very durable and reliable. I'm very happy with this product and so is my dog!
M**M
Great for training or dogs that cannot be trusted off-leash
I purchase the 30 foot length. This review is after the leash was used 2-3 times a day for a week. During this week we experienced typical New England weather - snow, sleet, rain, and sun which included muddy, salty, and sandy walks, short hikes through wooded areas, and water sports. The lead leash went through a lot in a short period of time.The leash is very light, the handle is comfortable, the leash clip is on a 360 swivel, and comes with a convenient storage bag. The weight and compactness of this lead leash would make it good for travel as well. I mostly practice hands-free walking. The waist strap goes through the handle leaving my hands free to manage the excess length of the leash safely or train. When I did use the handle it was comfortable.After the week of being dragged around 2-3 times a day the condition of the leash still looked pretty new. No concerning signs of wear or distress. There were some micro-fine nylon hairs starting to "fuzz," barely noticeable, had to look hard and up close. Did not fade after hand washing.The leash is a material that absorbs liquids so it will become heavier when wet. Then picks up sand, dirt, and mud this is when it's nice to have that storage bag. The material of the storage bag is rather cheap, I don't have faith it would stand up to rough use over time. If you're not conscious of how you're holding the excess leash and not holding that excess leash correctly, if your dog bolts, you may end up with rope burn.Also, the leash clip is cheap. You can tell the difference in quality between the standard quality leash clip to the clip on the lead leash. The spring load is not smooth and felt questionable in durability. However, it did stand up to the week of use, but I can't say I wasn't nervous about it. You may want to have a secondary clip system like a carabiner, and use both clips.Overall, a great lead leash package for the price.
A**D
Great lead
I’ve bought these in several lengths and all are great. They’re soft and comfortable to hold. Light enough they don’t weight me or my dog down. The hardware/fittings have all held up. I use the 30’ one daily and it doesn’t even show any wear.
R**J
Good Lead
First long lead I’ve purchased for 1 year old 50lb female Pitador. 50’ length is good for some freedom away from you instead of just a few feet. A good length to work on recall, you just have to be able recoil the lead as needed which is the only downside. Which is a bit challenging, if you don’t let out the full slack and have to hold it at say 25’ if that’s your working distance, and it’s not the easiest to hold if the dog is pulling, but most of the time not a big problem.Downside, when my dog is allowed to be Free, she usually bolts and when on the lead the slack uncoils fast, and in about 2-3 seconds she is already at the 50’ length and if you don’t have gloves on to try and stop the dog from getting yanked back your hands are gonna get rope burn. The first time I was using this she took off unexpectedly while she was using a full harness with the lead clipped to her front chest , underneath d ring, and she flipped head over paws, so just be careful, about full speed running, especially if you have the lead attached to a typical neck collar. I only attach this to her harness and use a collar for a 5’ leash.All in all a great lead. I like high visibility Orange just in case she would happen to get away from me and or it’s easy to pick up in grass and brush and for other people to see the dog is not off leash if not right by me, which is nice when you’re somewhere dogs are supposed to be leashed.The carry bag is cheap and average, it works, but isn’t something I prefer to carry the rope in, but until it tears, I’ll use it….but will definitely be purchasing a similar higher quality one that is not as noticeable and a little less quieter when moving.Lastly, 50’ is great, but for my dog I also want her to be a dog and have freedom and the ability to run on her terms sometimes as a reward and enrichment, so my dog needs a 100’ lead to allow her to sprint or maybe even 150’. Anyway, your dog may need a smaller lead or some other size. I’ll more than likely be purchasing another one of these in a longer size.I’d recommend and buy. So far good quality rope and no problem with the clip. The bag is the only reason I rated 4 stars…actual rating should be 4.8 stars. Not paid to review, but would definitely be glad if they sent me another lol!Update 7/21/23: The lead has held up well. So far no fraying or tears. The rope is usually brought for my pup during her walk to the park and I'll switch from leash to lead in her favorite open area spots. I attach this most of the time to her vest to her top clip. I don't usually walk her on this lead, but I have kept it on her while walking home at the end and it's doable, just not super convenient if you need your hands or she gets excited or spooked and pulls.The rope gets carried in the bag still, the rope is always being dragged on the ground over rocks, tree limbs, around tree trunks, grass, pavement, and yes it does float. The rope is obviously no longer bright orange, because of general use, but its still very orange. I bet if I washed it, the color would improve, but I'm not worried about it. Anyway, the lead so far has still proven durable, useful, and something we incorporate almost daily.
M**Y
Great training tool!
I have a 14 week old Bernese Mountain puppy and wanted a long lead that I could put on him to let him run freely but still have control. This definitely fits the bill. It is well made. The handle is comfortable and although I haven’t used it at the beach yet….I like the fact that it floats! Well made and worth the money
A**R
Quality lead
Our old 30ft leash was getting frayed after a year of constant use so I purchased this one last week. It's nicer then I expected. The leash is well braided and smooth, the clip is good quality, and the padded handle is my favorite part - so much more comfortable then my last long leash which was just the rope loop without the neoprene covering. We hike daily in the woods with this lead so it sees a lot of use. To clean it every once in a while I'd it drags thru something gross I just soak it in the sink with hot water and OxyClean then rinse and air dry. Looks brand new 👌🏻
N**R
Lynxking check cord dog leash
Great check cord dog leash for training and walks in the woods where my dog does not have to be right by my side, as in a structured walk. Durable. Easy to wipe off. Does not absorb rain water. The padded handle is a nice feature too. I have ordered 2 different lengths for different training exercises. Thanks lynxking
C**R
Great tool to use for recall
I bought this leash so I could maintain control over our new puppy. We like to run our dogs off-leash as much as possible. Using a long leash gives your dog the freedom to play and allows you to practice recall while keeping a safe grip on the pup.its made out of good quality material and easy on the hands
G**Z
Excelente
Tiene un muy buen largo y es bastante resistente
J**B
Holds up to my doberman pup
15' is a good length for me to let my doberman shepherd pup explore without getting TOO far away.It also stands up to her chewing & playing with the leash, no visible marks from her teething phase so far.I'm confident it'll hold up when she's full grown.
J**E
Great product
Sturdy and comfortable
J**A
La bonne longueur
Quand j'ai commandé j'avais pesé sur 50 pied et sa m'a mis une 10 pied j'aimerais quelqu'un m'aide avec sa et m'écris pour arranger sa.
TrustPilot
vor 3 Wochen
vor 2 Monaten